Built for the realities of Electricians.
Part P certs, EICRs, consumer-unit upgrades, each with their own paperwork and timing.
The three things that make this different
- The deposit goes into your own Stripe account at the moment of booking. We never hold your money. (Terms 2.3)
- One flat monthly price for your Stage, and hiring inside your Stage does not move the bill. No per-lead fee, and no commission on your customers' payments. (Terms Schedule 2)
- Leave on 30 days' notice with no exit fee, and take a full export of your data as CSV files from your own settings page, any time. (Terms 11.1 and 11.3)
- ✓ EICR test dates kept on every job
- ✓ Part P notification records
- ✓ Quote requests handled in one place
- ✓ Qualification expiry dates on every electrician
We do not generate compliance certificates. Your Gas Safe registered engineer or your qualified electrician issues the CP12, the EICR or the minor works certificate exactly as they do now, and what we keep is the document, the job record and the renewal date.
- Start-up is £199 a month, covering up to five on the tools.
- The one-off Onboarding Investment on Start-up is £129. The first ten firms pay no Onboarding Investment, on any Stage.
- Your card is authorised when you confirm your setup. Nothing is charged until you are live, after our review.
EICR cycles and Part P records, on the radar
Electrical work runs on cycles and notifications. EICRs come back round, typically every five years for rented homes, and the agent wants the report before the tenancy turns. Notifiable work under Part P reaches building control through your competent person scheme, and the record of that notification needs to be findable years later. Every consumer unit change adds another date to somebody’s list.
OptiTech Automation keeps that list for you. Each job holds its records: what was done, when, the report or notification reference and the next due date, with due dates surfacing before they slip. The platform does not issue an EICR or a Part P certificate and never will; your qualified electrician and your scheme do that. It makes sure the dates and records around them are never the thing that slips.
One honest limit, said now rather than later. Test instrument calibration is not something the platform tracks, so those dates stay wherever you keep them today. What it does hold is the qualification side: 18th Edition, ECS and scheme cards with their expiry dates and the certificate file, which is what dispatch reads before a job is offered to anyone.
Repeat work is the best work
The most profitable job an electrical firm does is the one it already did five years ago. The EICR you signed off then is due again, and the landlord will book whoever gets to them first. Firms that track this win the repeat work by default. Firms that keep it in a spreadsheet win it only when someone remembers to open the spreadsheet.
With due dates held against every property and customer, the renewal shows up on your radar before it expires, and the customer can book a real slot straight from your booking page, deposit paid. The calendar fills with the easiest work you will ever win.
The same cycle runs for smoke alarm checks in rentals, emergency lighting tests on commercial contracts and PAT rounds where you still do them. Anything with a due date behaves the same way: recorded once, against the job and the customer, and searchable by name when you need it.
A deposit at booking changes the no-show maths
Domestic electrical work suffers from the polite no-show: the customer who books a fault-find, quietly fixes it with a new fuse or a cousin, and never rings to cancel. Your electrician arrives to a closed door and the morning is gone. A card deposit taken at booking, into your own Stripe account, changes that completely.
It also changes the shape of enquiries. Online booking on your own site means the customer commits to a slot and a deposit in one sitting, at 9pm, without a phone call. You are no longer the firm that calls back on Thursday. You are the firm that was already booked by Thursday.
For quoted work like consumer unit changes and EV charger installs, the deposit does a second job: it filters tyre-kickers before you burn an evening on a detailed quote. The customer who pays a deposit on a survey visit has already half decided you are the firm.
Dispatch by qualification, not by who answers first
Testing and inspection needs your inspector, not your newest improver. Three-phase commercial work needs the engineers who hold the right experience. You mark who does what once, and jobs are assigned to the electricians who can actually take them, with you keeping the final say.
The engineer app carries the job history, photos, notes and signatures. In plant rooms and basements where signal goes to die, the rota stays readable and a status change or a note queues on the phone and sends when they surface. Photos need a connection to upload.
Commercial clients feel this too. When the same engineers keep turning up to the same site with the site history in the app, the client stops asking for your best bloke by name and starts trusting the firm. That is how the owner takes a holiday.
One flat price
From £199 a month plus a one-off £129 Onboarding Investment on the Start-up Stage, for up to five on the tools, or £599 plus £249 on Standard for up to fifteen. Flat within the stage, not per user: take on two more electricians this year and the bill stays exactly where it was. Past fifteen you move up to the Growth Stage, never onto a per-seat meter. No per-lead fees, no charge per booking, invoices raised on completion included.
There is no contract. Cancel any month with 30 days notice and take your data with you as CSV. The pricing is public because quote-based software pricing is a game electricians should not have to play.
Who this is not for
If you are a sole trader doing mostly day-rate work for one builder, with no certificates to chase and no team to schedule, you may genuinely not need this yet. A paper diary that works is not a problem to solve.
OptiTech Automation earns its keep when there are EICR cycles to track, a team to dispatch and no-shows costing van days. One van about to become two is exactly the right time. Ten vans drowning in paper is overdue.
Straight answers for Electricians
No. Certification stays where it belongs: with your qualified electrician and your competent person scheme. OptiTech Automation keeps the test dates and the notification records on file.
Each job holds its own records: what was tested, when, the report reference and the next due date. When a rented property comes back round, the renewal is on your radar and the customer can book a real slot straight from your booking page.
Yes. OptiTech Automation is built for teams from one van up to ninety engineers, and above that Empire is by application. Jobs are matched to the right electrician automatically and you keep the final say on every assignment.
Not from us, and honestly: free tools exist and can be enough for a solo diary. OptiTech Automation is for electrical firms with EICR cycles to track and no-shows costing van days. It starts at £199 a month plus a one-off £129 on the Start-up Stage, for up to five workers, and Standard is £599 plus £249 for up to fifteen. Flat, not per user.
Mostly. The rota month view and the details of an open job stay readable when signal drops, and a status change or a note queues on the phone and sends when the connection is back. Photos need a connection to upload.
Yes. Export from Jobber, import to OptiTech Automation. You are live within one working day of our written confirmation that your details are complete, and there are no per-lead fees once you are live.
Other trades: Plumbers · Gas Engineers · HVAC · Drainage · Roofers · Cleaning Companies · Property Maintenance · Builders
Keep reading: how online booking works for a electricians business · what it costs a month · who it suits, and who it does not · do the maths on your own numbers first
Guides for electricians

Software for an Electrical Company With Employees
What changes when an electrical firm goes from one van to a team, and what the software needs to handle once it does.

Electrician hourly rate UK 2026: what to charge (not what to pay)
A step-by-step method for UK electricians to work out what to charge per hour, using your own costs and hours, not a guessed market average.

EICR Record Keeping for Electrical Teams: Owning the 5 Year Clock
England's rental rules put every private tenancy on a five year EICR cycle, and electrical firms keep losing the dates between three vans and three paper systems. Here is the fix.
![Best Booking Software for UK Electricians [2026]](https://xmsqilnftxjffjhofobn.supabase.co/storage/v1/object/public/cms-images/2026/3428679e-afd3-4867-8128-83ab6c907411.png)
Best Booking Software for UK Electricians [2026]
A straightforward look at what booking and job management software actually needs to do for a UK electrical business: job scheduling, certificates, deposits, no double entry, and how the main options compare honestly.